Espresso Foundations

Step-by-step guide detail route used for SSR and navigation lab coverage.

Quick Checklist

  • Prep your station, filter, and measured dose.
  • Capture brew time, temperature, and tasting notes.
  • Adjust one variable at a time and compare outcomes.

Route slug: espresso-foundations

Brew Targets

  • Pour-over: 1:16 ratio, 92C-96C water, 2:45-3:30 total time.
  • Espresso: 1:2 ratio, 25-32 seconds, stable puck prep routine.
  • Cold brew: 1:8 concentrate, 12-16 hour steep, filtered twice.

Troubleshooting

  • Channeling: improve distribution and tamp consistency.
  • Weak body: increase dose or reduce brew water.
  • Over-extraction: coarsen grind and reduce contact time.